While this is a bit premature, it was very entertaining and fun to watch my C7 go thru the various production stages at BG when the car was being built. I wonder if the codes will change for the C8. I also hope we will be able to track our C8 orders on-line.
- 1000 Order On Hold at Dealership
- 1100 Order Placed at Dealership
- 1101 Order Entered into System
- 1102 Order Entered via Web
- 2000 Order Accepted by Chevrolet
- 2001 Order Generated to Dealer
- 2005 Order Replaced with GM Prospec Order
- 2030 Order Edited by Chevrolet
- 2050 Order Changed
- 2500 Order Preferenced (or “Picked Up” or “Imaged”), Sent to Production
- 3000 Order Accepted by Production Control
- 3100 Order Available to Sequence (now becomes more stable)
- 3300 Order Selected and Scheduled for Production by Assembly Plant (Target Production Week usually available now)
- 3400 Order Broadcasted for Production (Internal Plant Order Produced)
- 3800 Vehicle Produced
- 4000 Vehicle Available to Ship
- 4104 Bailment Invoice Created
- 4B00 Bayed (“B”, not 8)
- 4106 Bailment Released
- 4150 Vehicle Invoiced (Dealer Billed)
- 4200 Vehicle Shipped
- 4300 Intermediate Delivery
- 4V03 Estimated Delivery Date
- 4800 Rail Ramp Unload
- 5000 Vehicle Delivered to Dealer
- 6000 Vehicle Delivered to Customer
- 9000 Order Cancelled
Comment