Adnimation ATF

Collapse

MECF_728x90_top

Collapse

Announcement

Collapse
1 of 2 < >

Corvette Today Podcast: Corvette News/Headlines

With the reveal of the new mid-engine C8 Z06 next week, this CORVETTE TODAY News & Headlines episode is a “must listen-to” podcast! https://podcasts.adorilabs.com/corve...OSfY9cINY1UxSw Your CORVETTE TODAY host, Steve Garrett, teams up again with Keith Cornett from CorvetteBlogger.com to bring you the hottest headlines in the world of Corvette…including the latest on the C8 Z06 reveal on October 26th! Here are a few of the topics covered in this podcast:

1. The C8 Z06 will make public debut at the Petersen Automotive Museum on October 26
2. GM makes a change to 2022 Corvette ordered with Z51 and the high wing
3. C8 Corvette ranked 2nd on the list of the fastest selling cars in September 2021
4. C8 E-Rays are testing in Colorado and outside the Nurburgring in Germany
5. A 95 year old WWII veteran is moved to the head of the line to get his 2022 Corvette
6. Mazzanti to build a Corvette-powered Italian supercar with 761 horsepower
7. A truckload of C8’s goes up in flames
8. Watch a video of BGA building right-hand drive C8 Corvettes


You’ll know everything we know when you listen to this CORVETTE TODAY podcast!


Listen here: https://adori.page.link/corvette-today
Watch CORVETTE TODAY on YouTube: https://www.youtube.com/channel/UCXC...lOPPQ/featured
See more
See less

Latest ‘22 BGA Production Numbers

Collapse
This is a sticky topic.
X
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Originally posted by Vandalia1 View Post
    New to the forum. My 22 convertible will be built Thursday. I appreciate your production updates Please keep up the good work!
    We both are looking at Thursday. What's your vin number, mine is #4315?

    Comment


    • 4186 so my htc should be built around 4th car 2nd shift.

      Comment


      • 4463. So should be this week

        Comment


        • Many thanks to Murray for this post. I got my C8 14 months ago, and I still look at this thread every single day. A bunch of questions come to mind. Are all of the projected production numbers for MY2022 cars already ordered at the dealer level? And, to be clear, I am not a seller, but at what point does my car, which I know I could sell for 20% above msrp, start to suffer the normal 20-30% depreciation hit? And lastly, with these production #'s, at what point do you all think a buyer could walk into a Chevrolet dealer and see C8's on the lot and available for msrp or less? I think that will be 2023 at the earliest. Thoughts? And thanks again, Murray.
          First time Corvette owner, GJI - Shadow Gray, 3LT, HU3 - Morello Red, E60 - Front Lift, EYK - Chrome Badge, Q8P - silver wheels. Deposit on 07-23-2019, 3000 mid-January with TPW of 03-30-2020. 3400 on 07-21-2020 with TPW of 07-27-2020, took delivery 08-14-2020

          Comment


          • Originally posted by David-C8 View Post
            Many thanks to Murray for this post. I got my C8 14 months ago, and I still look at this thread every single day. A bunch of questions come to mind. Are all of the projected production numbers for MY2022 cars already ordered at the dealer level? And, to be clear, I am not a seller, but at what point does my car, which I know I could sell for 20% above msrp, start to suffer the normal 20-30% depreciation hit? And lastly, with these production #'s, at what point do you all think a buyer could walk into a Chevrolet dealer and see C8's on the lot and available for msrp or less? I think that will be 2023 at the earliest. Thoughts? And thanks again, Murray.
            Wish I could answer your questions, but I think these are things we won't know until they happen. It's a crazy world right now.
            Murray - Uxbridge, Ontario, Canada
            2020 Torch red Stingray coupe, Adrenaline red 2LT Q8Q E60 NPP
            Deposit: July 30/19, 1100: Sept 15/19, 3000: Feb 14/20, TPW WAS May 18, August 24 and lastly July 27,
            3300: July 15, 3400: July 22, 3800: July 30, 4200: Aug 06, 5000: Aug 7, 6000: Aug 12!

            Comment


            • 4091 > 4272 = 182

              Click image for larger version

Name:	Capture.JPG
Views:	261
Size:	168.4 KB
ID:	319810
              Murray - Uxbridge, Ontario, Canada
              2020 Torch red Stingray coupe, Adrenaline red 2LT Q8Q E60 NPP
              Deposit: July 30/19, 1100: Sept 15/19, 3000: Feb 14/20, TPW WAS May 18, August 24 and lastly July 27,
              3300: July 15, 3400: July 22, 3800: July 30, 4200: Aug 06, 5000: Aug 7, 6000: Aug 12!

              Comment


              • 4273 > 4455 = 183


                Click image for larger version

Name:	Capture.JPG
Views:	199
Size:	172.5 KB
ID:	320145
                Murray - Uxbridge, Ontario, Canada
                2020 Torch red Stingray coupe, Adrenaline red 2LT Q8Q E60 NPP
                Deposit: July 30/19, 1100: Sept 15/19, 3000: Feb 14/20, TPW WAS May 18, August 24 and lastly July 27,
                3300: July 15, 3400: July 22, 3800: July 30, 4200: Aug 06, 5000: Aug 7, 6000: Aug 12!

                Comment


                • Murray20c8 Sorry I couldn't post in the 2021 Thread because it is closed.

                  But according to your 2021 Production Thread, is it true the 2021 Production Started on December 14th 2020 and Ended on September 9th 2021 (9 Months start to Completion) ?
                  1999 C5 Magnetic Red Coupe -Z51 - SOLD 7/31/21
                  2021 C8 Red Mist Z51 HTC, 2LT Mag Ride & Front Lift

                  Carbon Flash Top/Mirrors/AH Splitter & Skirts, STD Silver Wheels
                  GT2 2-Tone Seats Sky Cool Grey/Black

                  Delivered – August 28th @ The National Corvette Museum

                  Comment


                  • Originally posted by Plentyfast View Post
                    Murray20c8 Sorry I couldn't post in the 2021 Thread because it is closed.

                    But according to your 2021 Production Thread, is it true the 2021 Production Started on December 14th 2020 and Ended on September 9th 2021 (9 Months start to Completion) ?
                    You can always DM me any questions.
                    But to answer your question "Yes"
                    Murray - Uxbridge, Ontario, Canada
                    2020 Torch red Stingray coupe, Adrenaline red 2LT Q8Q E60 NPP
                    Deposit: July 30/19, 1100: Sept 15/19, 3000: Feb 14/20, TPW WAS May 18, August 24 and lastly July 27,
                    3300: July 15, 3400: July 22, 3800: July 30, 4200: Aug 06, 5000: Aug 7, 6000: Aug 12!

                    Comment


                    • 4456 > 4612 = 157

                      Click image for larger version

Name:	Capture.JPG
Views:	99
Size:	172.5 KB
ID:	320491
                      Murray - Uxbridge, Ontario, Canada
                      2020 Torch red Stingray coupe, Adrenaline red 2LT Q8Q E60 NPP
                      Deposit: July 30/19, 1100: Sept 15/19, 3000: Feb 14/20, TPW WAS May 18, August 24 and lastly July 27,
                      3300: July 15, 3400: July 22, 3800: July 30, 4200: Aug 06, 5000: Aug 7, 6000: Aug 12!

                      Comment


                      • Looks like my new convertible was made yesterday on what would have been my dads 94th birthday!

                        thanks Murray for the updates.

                        Comment

                        MECF_728x90_bottom

                        Collapse
                        Working...
                        X