MECF_728x90_top

Collapse

Announcement

Collapse
See more
See less

I Made the Cut! Status 3300 ! (Update - Now at 3400)

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • I Made the Cut! Status 3300 ! (Update - Now at 3400)

    Click image for larger version  Name:	image_28641.jpg Views:	417 Size:	293.1 KB ID:	200657 Okay, I know it can get tiring seeing post after post of other people’s orders getting built, yet our orders are stuck at 3000 (or worse got cancelled and needs to be re-entered as a 2021). Well, after placing my deposit in SEP 2019 (I know, late to the game), then waiting since MAR 2020 when my order went to 3000, today the Corvette Concierge informed me I’m at 3300! I’m thinking that means it may get built next week (maybe!). Then possibly another week sitting behind BGA waiting for a car carrier (my dealer is between Kerbeck and MacMulkin off of I-95 so I’m hoping there won’t be a long wait for a car carrier). Therefore, I’m estimating a mid November delivery (fingers crossed). There is a light at the end of the C8 Tunnel!
    Last edited by BIG Dave; 10-30-2020, 10:00 AM. Reason: Updated Title to Reflect 3400
    Future: 2020 C8 Z51 3LT Torch Red - 3000 status
    Current: 2014 C7 Z51 3LT Torch Red
    Prior: 1992 C4, 1995 C4 2002 C5, 2005 C6, 2010 C6

  • #2
    Great news Big DAVE. We are pleased your baby is soon going down the assembly line — then arriving at your house for you to lust after up close and personal.
    GBA Black; HTO Twilight/Tension interior; Z51 & Mag Ride; E60 lift; 5VM visible carbon fiber package; 5ZZ high wing; FA5 interior vis CF; ZZ3 engine appearance; 3LT; Q8T Spectra Gray Tridents; J6N Edge Red Calipers; SNG Edge Red Hashmarks; VQK Splash Guards; RCC Edge Red engine cover; VJR illuminated sill plates. Lifetime, annual contributors, and 23 year members of National Corvette Museum. Home is the beautiful Pacific Northwest.

    Comment


    • #3
      Well Alright...Congrats Big Dave!!!

      Comment


      • #4
        Congrats! I too went to 3300 on Oct 20. My car is coming from MacMulkin. I hope I still have some money to pay for it!! 😀 It has been a long wait. I can say I have really enjoyed reading about the car and following all the YouTube owners who have posted so much good information. Also very much appreciate all the people on this forum who have shared their experience and answered my questions along the way. What a fun journey. My Christmas present might make it ! I would like to give a special thanks to John. He has been a great source of information and provided me great answers to some of the technical questions I have sent his way.
        3300 is closer but not there just yet!

        Comment


        • #5
          Congrats on the forward movement. It shouldn't be too much more longer before its in your possession 🍻🍻
          Arctic White 2LT, G8G, HUL, F9, AH2, 5ZZ, E60, STI, SHW J6F, Q8Q, RCC, Z51, ZYC.

          Comment


          • #6
            Originally posted by BIG Dave View Post
            ..... today the Corvette Concierge informed me I’m at 3300! I’m thinking that means it may get built next week (maybe!). Then possibly another week sitting behind BGA waiting for a car carrier (my dealer is between Kerbeck and MacMulkin off of I-95 so I’m hoping there won’t be a long wait for a car carrier). Therefore, I’m estimating a mid November delivery (fingers crossed). There is a light at the end of the C8 Tunnel!
            Congratulations BIG Dave on your C8 Order move to Event Code 3300... great news for you! I have noted your name and posts in the forums and know you have been waiting a long time and hope your C8 build & delivery goes quick and easy... keep us posted on future developments.
            Hoping for similar "great news", I checked-in with the CC about our C8 Order this morning, but no movement for us yet, our wait continues. -Rick
            2020 C8, 1YC07 (Coupe), Order Details: Deposit Aug18 (2019), Codes (in 2020) 1100-Feb10, 3000-Mar17, 3100-Nov4, 3300-Nov5, 3400-Nov18, 3800-TBD, 4200-TBD, 6000-TBD (likely Jan 2021 after 4+ week train transport, Seattle area).
            2LT Package, G8G (Arctic White), HTA (Black Leather Interior), AQ9 (GT1 Seats), Z51 (Perf Pkg), FE4 (Mag Ride), E60 (Front Lift), NPP (Perf Exhaust), Q8P (Wheels, Bright Silver), EYK (Chrome Emblems), VQK (Splash Guards).

            Comment


            • #7
              Congratulations! I share your delight. I also went to status code 3300. Hoping build and R8C not too far down the road. Will now be praying for good weather for trip home.
              2020 Torch Red Z51 HTC, MRC, E60

              Comment


              • #8
                Great stuff!!!
                3300 is usually 2 to 3 weeks out depending on where the vin lies.
                3400 is usually at the 1 to 2 weeks out.
                I'd guess your build week will be November 2nd with the build day late in the week or early in the week of the 9th
                Murray - Uxbridge, Ontario, Canada
                2020 Torch red Stingray coupe, Adrenaline red 2LT Q8Q E60 NPP
                Deposit: July 30/19, 1100: Sept 15/19, 3000: Feb 14/20, TPW WAS May 18, August 24 and lastly July 27,
                3300: July 15, 3400: July 22, 3800: July 30, 4200: Aug 06, 5000: Aug 7, 6000: Aug 12!

                Comment


                • #9
                  I also FINALLY went to 3300, according to Corvette Concierge this morning. It feels good to have made a small baby step forward.
                  On Order:
                  2020 Stingray Coupe, Torch Red, Adrenaline Red interior, 3LT, Z51, Mag Ride, Racing Stripe Pkg, Red Calipers, Red Engine Cover

                  Still Own:
                  2003 Corvette 50th Anniversary Pace Car
                  2016 Corvette Stingray Coupe, CRY, 3LT, Z51, Mag Ride

                  Lifetime Member, NCM

                  Comment


                  • #10
                    Great news. Mine went 3300 Sept 24. 3400 on Sept 28 with TPW 10/5, dealer called me with the VIN. Still waiting for production.

                    Comment


                    • #11
                      Your going to love it, well worth the wait, Our C8 has been flawless @ 3000 miles.
                      3LT Long Beach Red , Z51, FE4 , ZZ3, Black interior ,38S red stitching, Q8T, FA5, ER1, CFX, and R8C

                      Comment


                      • #12
                        Originally posted by Murray20c8 View Post
                        Great stuff!!!
                        3300 is usually 2 to 3 weeks out depending on where the vin lies.
                        3400 is usually at the 1 to 2 weeks out.
                        I'd guess your build week will be November 2nd with the build day late in the week or early in the week of the 9th
                        I thought things moved faster than that. The last time I ordered a Corvette was for my 2010 C6 and I thought it progressed pretty quickly once it got to 3300. Oh well, still making progress!
                        Future: 2020 C8 Z51 3LT Torch Red - 3000 status
                        Current: 2014 C7 Z51 3LT Torch Red
                        Prior: 1992 C4, 1995 C4 2002 C5, 2005 C6, 2010 C6

                        Comment


                        • #13
                          Originally posted by BIG Dave View Post

                          I thought things moved faster than that. The last time I ordered a Corvette was for my 2010 C6 and I thought it progressed pretty quickly once it got to 3300. Oh well, still making progress!
                          You never know with 2 shifts running / parts availability / production efficiency. It's just what I've seen. Let's hope it's built next week! I'd like nothing more than to be wrong.
                          Murray - Uxbridge, Ontario, Canada
                          2020 Torch red Stingray coupe, Adrenaline red 2LT Q8Q E60 NPP
                          Deposit: July 30/19, 1100: Sept 15/19, 3000: Feb 14/20, TPW WAS May 18, August 24 and lastly July 27,
                          3300: July 15, 3400: July 22, 3800: July 30, 4200: Aug 06, 5000: Aug 7, 6000: Aug 12!

                          Comment


                          • #14
                            Congrats BIG Dave! As soon as you start to drive your new baby the waiting blues will turn into the “I can’t believe it’s mine” hop!

                            Vette's owned: 99 Sebring Silver Convert - 10yrs, 2008 Crystal Red Convert,w/cam, longtubes and Vortech supercharger. C8 VIN 00336 built on 2/10/20 - Delivered 3/18/20 C8 Spec: Torch Red 2LT, Z51, FE4, E60, CF7, FA5, AH2, HUL, J6E, TU7, 3F9, Q8P, 5ZU, R8C

                            Comment


                            • #15
                              I've been 3300 for just about two weeks now. Probably because of the 1 week shutdown it's taking a little longer.
                              Torch Red Convertible / adrenaline Red interior, 2LT, Carbon Flash Wheels, Yellow Calipers, Lift, NPP
                              Previous Vettes: 82 Collector Edition/ 05 Red Coupe

                              Comment

                              MECF_728x90_bottom

                              Collapse
                              Working...
                              X